Please use this identifier to cite or link to this item: https://dspace.univ-ouargla.dz/jspui/handle/123456789/14630
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorRidha, Mabrouk-
dc.contributor.authorYousfi, Salem-
dc.contributor.authorArouaoui, Riyadh-
dc.date.issued2017-
dc.identifier.urihttp://dspace.univ-ouargla.dz/jspui/handle/123456789/14630-
dc.descriptionUniversité Kasdi Merbah – Ouargla. Faculté des Hydrocarbures et des Énergies Renouvelables et des sciences de la Terre et d’Univers. Département de Forage et Mécanique des Chantiers Pétroliers. Mémoire Pour l’obtention du diplôme Master en Forage. Option : Forageen_US
dc.description.abstractLe pétrole est un combustible fossile, non renouvelable, très important dans l'industrie mondiale, donc il est nécessaire de le consommer avec une rationalisation. L’industrie pétrolière est un pilier de l’économie mondiale. L’or noir est une source majeure d’énergie. La Sahara algérienne est riche en pétrole. Elle est subdivisée en un certain nombre de bassins qui renferment un certain nombre de champs dont celui-ci HASSI MESSAOUD objet de notre étude. Afin d’augmenter la qualité des réservoirs de gisement on à fait une étude sur le coincement de la garniture de forage lors de la phase16 "pour obtenir des résolutions des problèmes qui assurent le bon déroulement des opérations et la réussite du forage en gagnant le temps, réduisant le cout. Mots clés : Pétrole, L’industrie pétrolière, HASSI MESSAOUD, coincement, garniture, la phase 16".Oil is a fossil fuel, not renewable, very important in the global industry, it is necessary to consume it with rationalization. The oil industry is a pillar of the global economy. Black gold is a major source of energy. The Algerian Sahara is rich with oil. It is subdivided into a number of basins that contain a numerous fields including this one HASSI MESSAOUD subject of our study. In order to increase the quality of the deposit tanks is quite a study on the Jamming of the drill string at the 16" phase to obtain resolutions of problems that ensure the smooth running of operations and the drilling success is to stop wast time and less cost. Key words : Oil, The oil industry, HASSI MESSAOUD, Jamming, drill, the 16" phase.en_US
dc.language.isofren_US
dc.subjectPétroleen_US
dc.subjectL’industrie pétrolièreen_US
dc.subjectHASSI MESSAOUDen_US
dc.subjectcoincementen_US
dc.subjectgarnitureen_US
dc.subjectla phase 16".en_US
dc.titleEtude de coincement dans la phase 16" dans le champ de HASSI MESSAOUD -Cas du puits MD260Bis-en_US
dc.typeThesisen_US
Appears in Collections:Département de Forage et Mécanique des chantiers pétroliers - Master

Files in This Item:
File Description SizeFormat 
Yousfi Salem +Arouaoui Riyadh.pdf3,76 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.