Please use this identifier to cite or link to this item: https://dspace.univ-ouargla.dz/jspui/handle/123456789/17170
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorZerrouki, ALI Ahmed-
dc.contributor.authorSABEG NAIMA-
dc.date.issued2018-
dc.identifier.urihttp://dspace.univ-ouargla.dz/jspui/handle/123456789/17170-
dc.descriptionFaculté des hydrocarbures energies renouvelables et science de la terre et de l’univers Département de production des hydrocarbures MEMOIRE Pour obtenir le Diplôme de Master Option: Production Académiqueen_US
dc.description.abstractTo increase the production, the water flooding has been used as a secondary recovery process. By the time the water cut is going up then the production is decreasing, for that EL Agreb productions wells are currently activated by the gas lift with CCE which is not really efficient because of the injection pressure insufficiency. Our main goal is to figure out which the best technical-economic activating mode shall be used to increase the hydrocarbon production among the following ones: Conventional lift gas valves (mandrels) or the ESPen_US
dc.language.isofren_US
dc.subjectchamp d’El Agreb,en_US
dc.subjectle pourcentage d’eau produite water cut,en_US
dc.subjectgaz lift,en_US
dc.subjectCCEen_US
dc.subjectESPmandrinen_US
dc.titleEtude des différents modes d’activation des puits dans le champ d’El Agreben_US
dc.typeThesisen_US
Appears in Collections:Département de production des hydrocarbures- Master

Files in This Item:
File Description SizeFormat 
SABEG NAIMA.pdf5,92 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.