Please use this identifier to cite or link to this item:
https://dspace.univ-ouargla.dz/jspui/handle/123456789/30953
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Mohamed Yakoub, KHELIFI TOUHAMI | - |
dc.contributor.author | Ibrahim, HADJI | - |
dc.date.accessioned | 2022-10-22T19:29:24Z | - |
dc.date.available | 2022-10-22T19:29:24Z | - |
dc.date.issued | 2022 | - |
dc.identifier.uri | https://dspace.univ-ouargla.dz/jspui/handle/123456789/30953 | - |
dc.description | Measurement, Metrology and quality | en_US |
dc.description.abstract | Commissioning of power transformer After new power transformer has been set up on site and before it connects with power supply and loading the load, it is must to have to go through numbers of testing procedures for confirming the specifications and performances of a power transformer. The purpose of commissioning tests on transformer is to satisfy, to pre-determined standards, that all the equipment erection is correct and that all the equipment connections or cables have been installed in accordance with the approved erection drawings and diagrams | en_US |
dc.language.iso | en | en_US |
dc.publisher | KASDI MERBAH UNIVERSITY_OUARGLA | en_US |
dc.subject | Power Transformer | en_US |
dc.subject | Commissionning | en_US |
dc.title | Commissioning of Power Transformer | en_US |
dc.type | Thesis | en_US |
Appears in Collections: | Département de Génie Appliqué Licence |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
khelifi-hadji.pdf | 911,92 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.