Please use this identifier to cite or link to this item: https://dspace.univ-ouargla.dz/jspui/handle/123456789/34583
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorMiloudi, Mustapha-
dc.contributor.authorFadel, Mohamed Amine-
dc.contributor.authorChabbi, Abdelhamid-
dc.date.accessioned2023-10-06T23:18:12Z-
dc.date.available2023-10-06T23:18:12Z-
dc.date.issued2023-
dc.identifier.urihttps://dspace.univ-ouargla.dz/jspui/handle/123456789/34583-
dc.descriptionUniversity Of Kasdi Merbah Ouargla Faculty of Hydrocarbons, Renewable Energy and Earth and Universe Sciences Department of Hydrocarbons Production Dissertation To obtain the Diploma of Master Option: Professionnel Productionen_US
dc.description.abstractLiquid loading, a significant issue in the Tegentour zone of the In Saleh Gas Field, was addressed in this study. Two wells were examined using well production data, well test data, logging, and pressure surveys to identify symptoms of liquid loading. The proposed solutions included implementing a velocity string and conducting a water shut-off installation. The optimal configuration of the velocity string was determined through simulation using Wellflo software. The results of implementing both technologies were thoroughly discussed and analyzed, providing valuable insights into mitigating liquid loading.en_US
dc.language.isoenen_US
dc.subjectLiquid Loadingen_US
dc.subjectWater Loadingen_US
dc.subjectWell Flo softwareen_US
dc.subjectSymptomsen_US
dc.subjectWater Shut Offen_US
dc.subjectVelocity Stringen_US
dc.titleSolving the water loading problem in In Saleh gas Fielden_US
dc.typeThesisen_US
Appears in Collections:Département de production des hydrocarbures- Master

Files in This Item:
File Description SizeFormat 
Mohamed Amine Fadel+Abdelhamid Chabbi.pdf4,73 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.