Please use this identifier to cite or link to this item: https://dspace.univ-ouargla.dz/jspui/handle/123456789/37221
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorBOUTALBI, MOHAMMED CHAKER-
dc.contributor.authorMESKINE, ABDELFETTAH-
dc.contributor.authorZEHANA, MOHAMED-
dc.date.accessioned2024-10-09T11:28:54Z-
dc.date.available2024-10-09T11:28:54Z-
dc.date.issued2024-
dc.identifier.urihttps://dspace.univ-ouargla.dz/jspui/handle/123456789/37221-
dc.descriptionKASDI MERBAH University of Ouargla Faculty of Hydrocarbons, Renewable Energies, and Earth and Universe Sciences Hydrocarbon Production Department THESIS To obtain a Master's Degree Option: Production of Hydrocarbonen_US
dc.description.abstractThis work delves deep into the optimizing of wells in the GASSI TOUIL field, focusing on both eruptive wells GT03, GT30, GT45. we evaluate that GT03 (non-candidate for the gas shutoff operation), GT30 and GT45 have been successful in shutting off the gas, which have improved the oil production rate (GT30 from 54.24 m3/d to161.5 m3/d and GT45 from 7.79 m3/d to 21.58 m3/d), based on PLT data and the evaluation of this data with EMERAUD software. And non-eruptive wells (HC 05 and GT35) through artificial lift techniques: well, HC05 is improved using SRP to optimize the oil flowrate from 10.943 m3/d to 24.048 m3/d, and well GT35 is upgraded with an ESP with modeling done via PIPESIM software to optimize the liquid flowrate from 97.85 m3/d to 170 m3/d.en_US
dc.language.isoenen_US
dc.subjectoptimizingen_US
dc.subjectEMERAUDen_US
dc.subjectPIPESIMen_US
dc.titleProduction wells optimizing in GASSI TOUIL field with Water& Gas Shutoff, Sucker Rod Pump and Electrical Submersible Pumpen_US
dc.typeThesisen_US
Appears in Collections:Département de production des hydrocarbures- Master

Files in This Item:
File Description SizeFormat 
MESKINE ABDELFETTAH + ZEHANA MOHAMED TAHER.pdf5,61 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.