Please use this identifier to cite or link to this item:
https://dspace.univ-ouargla.dz/jspui/handle/123456789/20946
Title: | Just in time multicriteria scheduling problem in two-machine flow shop |
Authors: | OUIDDIR, Djedjiga BOUIBEDE HOCINE, Karima BOUDHAR, Mourad |
Keywords: | scheduling flowshop just in time multicriteria MILP model heuristic |
Issue Date: | 5-Mar-2019 |
Publisher: | Université Kasdi Merbah Ouargla |
Series/Report no.: | 2019; |
Abstract: | In this paper, we are interested in the just in time multicriteria two-machine flow shop scheduling problem. Our aim is to highlight basic scheduling objective functions and the notion of just in time in production management. A cost function is defined for each job, taking into account additional constraints. We also position our problem with regard to what exists in the literature. First, we provide a brief literature review concerning the bi-criteria flow shop scheduling problem (FSP). Afterwards, we propose a mixed integer linear programming (MILP) formulation and two heuristics to solve the problem along with an experimental study we conducted in order to test their performance. |
Description: | Le 2eme Conference Internationale sur intelligence Artificielle et les Technologies Information ICAIIT 2019 |
URI: | http://dspace.univ-ouargla.dz/jspui/handle/123456789/20946 |
Appears in Collections: | 2. Faculté des nouvelles technologies de l’information et de la communication |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
OUIDDIR Djedjiga.pdf | 533,42 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.