Abstract: In the field of hydrocarbon production, the control of resources has great importance. The estimation of the net pay is a key parameter in the evaluation and characterization of the reservoir. Accurate estimation of this parameter made it possible to obtain the most realistic assessment of the reservoir possible. In this work data from PLT and well tests were used to estimate this parameter. An improvement in productivity in the MDZ-627 horizontal well is noticed. The well was drilled by crossing drains D4 and D5. The barefoot configuration with 6 inches in open hole from 3347 to 4006 MD is well done. It was noticed that the results obtained by the PLT data and the well tests for the well MDZ-627 are similar.
Description: Faculté des hydrocarbures energies renouvelables et science de la terre et de l’univers Département de Production des Hydrocarbures MEMOIRE Pour obtenir le Diplôme de Master Option : Production Académique
URI: http://dspace.univ-ouargla.dz/jspui/handle/123456789/25207
Appears in Collections:Département de production des hydrocarbures- Master

Files in This Item:
File Description SizeFormat 
Djedid Mohammed Abdesselam + Djerourou Nedjmeddine.pdf3,18 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.