Please use this identifier to cite or link to this item: https://dspace.univ-ouargla.dz/jspui/handle/123456789/34583
Title: Solving the water loading problem in In Saleh gas Field
Authors: Miloudi, Mustapha
Fadel, Mohamed Amine
Chabbi, Abdelhamid
Keywords: Liquid Loading
Water Loading
Well Flo software
Symptoms
Water Shut Off
Velocity String
Issue Date: 2023
Abstract: Liquid loading, a significant issue in the Tegentour zone of the In Saleh Gas Field, was addressed in this study. Two wells were examined using well production data, well test data, logging, and pressure surveys to identify symptoms of liquid loading. The proposed solutions included implementing a velocity string and conducting a water shut-off installation. The optimal configuration of the velocity string was determined through simulation using Wellflo software. The results of implementing both technologies were thoroughly discussed and analyzed, providing valuable insights into mitigating liquid loading.
Description: University Of Kasdi Merbah Ouargla Faculty of Hydrocarbons, Renewable Energy and Earth and Universe Sciences Department of Hydrocarbons Production Dissertation To obtain the Diploma of Master Option: Professionnel Production
URI: https://dspace.univ-ouargla.dz/jspui/handle/123456789/34583
Appears in Collections:Département de production des hydrocarbures- Master

Files in This Item:
File Description SizeFormat 
Mohamed Amine Fadel+Abdelhamid Chabbi.pdf4,73 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.