Please use this identifier to cite or link to this item:
https://dspace.univ-ouargla.dz/jspui/handle/123456789/34583
Title: | Solving the water loading problem in In Saleh gas Field |
Authors: | Miloudi, Mustapha Fadel, Mohamed Amine Chabbi, Abdelhamid |
Keywords: | Liquid Loading Water Loading Well Flo software Symptoms Water Shut Off Velocity String |
Issue Date: | 2023 |
Abstract: | Liquid loading, a significant issue in the Tegentour zone of the In Saleh Gas Field, was addressed in this study. Two wells were examined using well production data, well test data, logging, and pressure surveys to identify symptoms of liquid loading. The proposed solutions included implementing a velocity string and conducting a water shut-off installation. The optimal configuration of the velocity string was determined through simulation using Wellflo software. The results of implementing both technologies were thoroughly discussed and analyzed, providing valuable insights into mitigating liquid loading. |
Description: | University Of Kasdi Merbah Ouargla Faculty of Hydrocarbons, Renewable Energy and Earth and Universe Sciences Department of Hydrocarbons Production Dissertation To obtain the Diploma of Master Option: Professionnel Production |
URI: | https://dspace.univ-ouargla.dz/jspui/handle/123456789/34583 |
Appears in Collections: | Département de production des hydrocarbures- Master |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Mohamed Amine Fadel+Abdelhamid Chabbi.pdf | 4,73 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.