Please use this identifier to cite or link to this item:
https://dspace.univ-ouargla.dz/jspui/handle/123456789/2873
Title: | FH 2(P 2,P 2) hybrid flow shop scheduling with recirculation of jobs |
Authors: | Nadjat Meziani1 and Mourad Boudhar2 |
Keywords: | Hybrid flow shop complexity recirculation makespan |
Issue Date: | 19-Dec-2013 |
Abstract: | In this paper, two hybrid flow shop scheduling problems to minimize the makespan are presented. The first is the hybrid flow shop on two stages with only one machine on each stage and recirculation of jobs. This problem is polynomial. The second one is the hybrid flow shop on two stages such as each one contains two identical parallel machines and every job recirculates a finite number of times. This problem is NP- hard in general. Linear mathematical formulation and heuristics are also presented with numerical experimentations |
Description: | 7 ieme Colloque sur l Optimisation et les Systèmes d’Information COSI 2010 18-20 Avril 2010 |
URI: | http://hdl.handle.net/123456789/2873 |
ISSN: | kh |
Appears in Collections: | 1. Faculté des mathématiques et des sciences de la matière |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Nadjat Meziani.pdf | 701,38 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.