Please use this identifier to cite or link to this item:
https://dspace.univ-ouargla.dz/jspui/handle/123456789/13512
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Latifa Bouklikha | - |
dc.date.accessioned | 2016 | - |
dc.date.available | 2016 | - |
dc.date.issued | 2016 | - |
dc.identifier.issn | 2437-1033 | - |
dc.identifier.uri | http://dspace.univ-ouargla.dz/jspui/handle/123456789/13512 | - |
dc.description | Journal of Quantitative Economics Studies | en_US |
dc.description.abstract | Technological advances have led to the emergence of complex production systems, which has increased the importance of scheduling and control of the production process to achieve an optimum utilization of production resources; this is what calls for the use of quantitative methods to help in analysis and studies of these systems. In this work we studied scheduling problems and production control, by providing multi criteria models, through a particular study in the company of MANTAL, contribution to an effective control of the production system, and decision making. | en_US |
dc.language.iso | en | en_US |
dc.relation.ispartofseries | Number 02/2016; | - |
dc.subject | Scheduling Production | en_US |
dc.subject | Decision Making | en_US |
dc.subject | Multi-Criteria | en_US |
dc.subject | Compromise Programming | en_US |
dc.title | Scheduling production units by the use of Compromise Programming – Case study MANTAL enterprise – | en_US |
dc.type | Article | en_US |
Appears in Collections: | Number 02/2016 |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.