Please use this identifier to cite or link to this item: https://dspace.univ-ouargla.dz/jspui/handle/123456789/38712
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorABIDI SAAD, Aissa-
dc.contributor.authorGuerfi, Djelloul-
dc.contributor.authorSiagh, Mohammed Samir-
dc.date.accessioned2025-11-13T09:17:39Z-
dc.date.available2025-11-13T09:17:39Z-
dc.date.issued2025-
dc.identifier.urihttps://dspace.univ-ouargla.dz/jspui/handle/123456789/38712-
dc.descriptionREPUBLIQUE ALGERIENNE DEMOCRATIQUE ET POPULAIRE MINISTÈRE DE L'ENSEIGNEMENT SUPÉRIEUR ET DE LA RECHERCHE SCIENTIFIQUE Université Kasdi Merbah Ouargla Faculté des Hydrocarbures, Energie Renouvelables et Science de la Terre et l’Univers Département Forage et Mécanique des Chantiers pétrolière Mémoire de MASTER PROFESSIONNEL Domaine : Sciences et Technologies Filière : Hydrocarbure Option : Forage Professionnelen_US
dc.description.abstractThe cementing operation is one of the most important procedures in the construction and development of oil wells; however, sometimes problems arise during the job and lead to unsatisfactory results. One such case that we studied was the cementing of the 7" liner in well TAOSW#1. After drilling the 8"1/2 phase and setting the Liner Hanger, the cementing operation began with the pumping of fluids according to the cementing program. The entire calculated volume was pumped; however, the final pressure bump, which indicates the end of the cementing operation, was not achieved. Our analysis of the logs (CBL, VDL, USIT), along with the cementing chart and verification of the results, revealed poor cementing of the 7" liner and allowed us to identify the source of the problem. Then to remedy this problem, a remedial cement job was carried out.en_US
dc.language.isofren_US
dc.subjectCementingen_US
dc.subjectLineren_US
dc.subjectLoggingen_US
dc.subjectremedial cement joben_US
dc.subjectCasing scraperen_US
dc.subjectSqueezeen_US
dc.subjectCement plugen_US
dc.subjectOverlapen_US
dc.titleÉtude et analyse du problème d’une mauvaise cimentation de la phase 8"1/2 Cas du puits (TAOSW#1)en_US
dc.typeThesisen_US
Appears in Collections:Département de Forage et Mécanique des chantiers pétroliers - Master

Files in This Item:
File Description SizeFormat 
Guerfi Djelloul+Siagh Mohammed Samir.pdf4,79 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.