Please use this identifier to cite or link to this item: https://dspace.univ-ouargla.dz/jspui/handle/123456789/41653
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorMANSOURI, Zina-
dc.contributor.authorBOUGRINAT, Mohammed Belkhir-
dc.contributor.authorYOUCEF, Mohammed Yassine-
dc.date.accessioned2026-10-13T10:15:11Z-
dc.date.available2026-10-13T10:15:11Z-
dc.date.issued2026-
dc.identifier.urihttps://dspace.univ-ouargla.dz/jspui/handle/123456789/41653-
dc.descriptionForage d’eauen_US
dc.description.abstractCette étude explore les détails de l'achèvement d'un puits de compensation des eaux souterraines à proximité de Megarine dans l'État de Touggourt, utilisant la technologie de forage rotatif avec de l'argile bentonite pour atteindre une profondeur finale de 170 mètres linéaires. Cette étude est divisée en deux parties : une théorique qui couvre les techniques de forage et l'étude hydrologique et géologique des couches pénétrantes d'argile, de sable grossier et de chaux, et une scientifique qui se concentre sur les résultats obtenus lors du pompage expérimental, où les débits maximaux (Qmax) ont atteint environ 118,83 m³/heure avec une dénivellation de 34,70 mètres. Les calculs techniques pour les opérations d'installation ont révélé un besoin de 1,10 m³ de lait de ciment (1,21 tonnes) pour la première étape, et un volume de 13,08 m³ (14,38 tonnes) pour la deuxième étape. Le volume de gravier filtrant (Gravillonnage) nécessaire pour l'espace annulaire de la colonne de captage d'une taille de 1,82 m³ a été calculé et la fiche technique du projet a été établie sous la supervision de l'Agence Nationale des Ressources Hydrauliques (ANRH).en_US
dc.description.abstractThis study examines the details of completing a replacement groundwater well in the vicinity of Magarin, in the province of Touggourt, utilizing rotary drilling technology with bentonite mud to reach a final depth of 170 linear meters.This study is divided into two parts: a theoretical section covering drilling techniques and the hydrological and geological analysis of the penetrated strata (clay, coarse sand, and limestone), and a practical section focusing on results obtained during test pumping, where maximum flow rates (Qmax) reached approximately 118.83 m³/h with a drawdown of 34.70 meters. Technical calculations for the cementing operations indicated a requirement of 1.10 m³ of cement slurry (1.21 tons) for the first stage and 13.08 m³ (14.38 tons) for the second stage. Additionally, the volume of filter gravel required for the annular space of the well casing was calculated at 1.82 m³, and the project's technical datasheet was prepared under the supervision of the National Agency for Hydraulic Resources (ANRH-
dc.publisherUNIVERSITÉ KASDI MERBAH – OUARGLAen_US
dc.subjectTouggourten_US
dc.subjectnappe phréatiqueen_US
dc.subjecttechniques de forageen_US
dc.subjectrotatifen_US
dc.subjectgéologiqueen_US
dc.subjectpuitsen_US
dc.subjectfiche techniqueen_US
dc.subjecthydrologiqueen_US
dc.titleRéalisation d’un forage d’eau pour l’irrigation dans la région de Megarine wilaya de Touggourten_US
dc.typeThesisen_US
Appears in Collections:Département de Hydraulique et Génie Civil - Master



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.