Please use this identifier to cite or link to this item:
https://dspace.univ-ouargla.dz/jspui/handle/123456789/5269
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | KADRI, Mohamed Yacine | - |
dc.contributor.author | HADJ AISSA ,SALAH | - |
dc.contributor.author | HADJ SAID ,KACEM | - |
dc.date.issued | 2014 | - |
dc.identifier.uri | http://dspace.univ-ouargla.dz/jspui/handle/123456789/5269 | - |
dc.description.abstract | Résumé : L’opération de forage constitue l’étape la plus importante et la plus délicate dans toute exploitation pétrolière, depuis l’installation de l’appareil de forage jusqu'à la mise en production du puits. Afin de réduire le nombre et le coût du tubage, notre étude consiste en un suivi du déroulement de la descente et de la cimentation d’une colonne, et plus précisément le liner 7 ’’ (puits OMN82bis, Hassi-Messaoud). Celui-ci assure l’étanchéité et l’isolation des formations ; il doit être suspendu dans la colonne précédent la « 8 1/2’’ » (section over lap), et leur cimentation se fait dans l’espace annulaire (trou-tubage 7’’ et tubage 7’’- tubage 81/2 ’’). Les tests qualitatifs du ciment « CBL, VDL » sont effectués afin de mettre en évidence les zones de mauvaise cimentation et d’y remédier dans d’éventuelles autres opérations.; Abstract: The drilling operation is the largest and the most delicate step in oil exploitation, since the installation of the rig until the production from the well. To reduce the number and cost of the casing, our study is a follow-up of the conduct of the descent and the cementing of a column, and more specifically the liner 7 '' (wells OMN82bis, Hassi-Messed). It ensures the tightness and insulation of the formations; He should be suspended in the previous column the "8 1/2" "(section overlap), and their cementation occurs in the annular space (hole-casing 7 '' and casing 7 '' - casing 81/2"). «CBL, VDL» cement qualitative tests are performed in order to highlight areas of poor cementing and remedy in any other operations. | en_US |
dc.language.iso | fr | en_US |
dc.relation.ispartofseries | 2014; | - |
dc.subject | column | en_US |
dc.subject | liner 7 | en_US |
dc.subject | section overlap | en_US |
dc.subject | annular space | en_US |
dc.subject | CBL | en_US |
dc.subject | VDL | en_US |
dc.subject | casing 81/2 | en_US |
dc.subject | la colonne 81/2 | en_US |
dc.subject | section over lap | en_US |
dc.subject | CBL-VDL | en_US |
dc.subject | cimentation | en_US |
dc.title | Descente et cimentation du liner 7" Dans le champ de Hassi-Messaoud, Application sur le puits OMN82bis | en_US |
Appears in Collections: | Département des Energies Renouvelables - Master |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
HADJ AISSA SALAH + HADJ SAID KACEM.pdf | 4,87 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.