Please use this identifier to cite or link to this item: https://dspace.univ-ouargla.dz/jspui/handle/123456789/19337
Title: Critères de choix d’une complétion GAS-LIFT avec système de dessalage (Complétion Parallèle) sur le Champ de HMD
Authors: CHATTI, Djamel Eddine
ANTOURI, Hanane
ARBI, Boutheina
Keywords: : Parallel completion
, salt deposits
GAS-LIFT
, desalination
depletion
selection criteria.
Issue Date: 2018
Abstract: All oil companies aspire to achieve optimal and sustainable productivity by applying the new technics in the oil field. In the other hand HMD field presents several exploitation problems (depletion, salt deposits…), which decreases the productivity of the wells. In order to solve these problems, a new completion called "parallel completion" has been developed specifically for the HMD field to ensure optimization of water and gas injection simultaneously and separately (water for desalinating and GAS-LIFT for lighting the production column) eliminating therefor the drawbacks of the completions already used for this kind of problems, our study focuses on:  Criteria of choosing a well candidate for the parallel completion.  The methodology for selecting a candidate well for such a completion.
Description: Université KasdiMerbah - Ouargla - Faculté des hydrocarbures , des énergies renouvelables et des sciences de la terre et de l’univers Département de production MEMOIRE Pour obtenir le Diplôme de Master Option : production académique
URI: http://dspace.univ-ouargla.dz/jspui/handle/123456789/19337
Appears in Collections:Département de production des hydrocarbures- Master

Files in This Item:
File Description SizeFormat 
Memoire.pdf10,39 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.