Title: CHOIX D’UNE COMPLETION PARALLELE ADEQUATE DES PUITS SALES ET NON ERUPTIFS (Cas de puits MDZ651)
Authors: BELMILOUD, F
FIHAKHIR, Mohammed Abdeldjalil
KHALIFA Ahmed Houssam
BENZAOUI, Abdennour
Keywords: Depletion
gisement
completion
Lifting
simulation
, productivity
PROSPER
Issue Date: 2018
Abstract: The purpose of the completion is to allow the effluent to flow from the bottom of the well to the surface but in the HMD field there are several problems such as the depletion of the reservoir pressure, the damage, and there exists also other type of problems caused by the dolomitic Lias table. For this, the correct choice of completion for the resolution of the problems is the parallel completion which makes it possible to maintain the production by lifting and desalting by the continuous injection of fresh water. The purpose of our study was to establish a completion change from the old completion and to see its impact on MDZ651 well productivity. Based on the study and simulation of PROSPER software on the MDZ651 well, the well is a good candidate for GLC parallel completion, and the use of this well can improve productivity and stabilize its behavior given the results obtained.
Description: Université Kasdi Merbah Ouargla Faculté des hydrocarbures energies renouvelables et science de la terre et de l’univers Département de production des hydrocarbures MEMOIRE Pour obtenir le Diplôme de Master Option: Production professionnel
URI: http://dspace.univ-ouargla.dz/jspui/handle/123456789/19355
Appears in Collections:Département de production des hydrocarbures- Master

Files in This Item:
File Description SizeFormat 
Thèse.pdf8,14 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.