Please use this identifier to cite or link to this item:
https://dspace.univ-ouargla.dz/jspui/handle/123456789/27888
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Boufades, Djamila | - |
dc.contributor.author | KRIM, Adel | - |
dc.contributor.author | KOUICEM, fatima zahera | - |
dc.contributor.author | LATRECHE, Nour Elhouda | - |
dc.date.accessioned | 2022-04-13T18:55:32Z | - |
dc.date.available | 2022-04-13T18:55:32Z | - |
dc.date.issued | 2021 | - |
dc.identifier.uri | http://dspace.univ-ouargla.dz/jspui/handle/123456789/27888 | - |
dc.description.abstract | Abstract The recovery assisted by gas injection in order to maintain the reservoir pressure of the Hassi Messaoud field to contribute effectively in the productivity improvement of oil producing wells by increasing the flow of oil. But this process of recovery is the major reason of the GOR rise in MDZ627 well and even in the other wells of the zone. by analyses of the various factors that may be the cause of this problem. The PLT production data and the gauging tests showed that 49% of the gas produced comes from the D4 drain and 51% from the D5. The implementation of a semi-intelligent completion has shown remarkable efficiency in eliminating the breakthrough and restoring the initial state of the well. Keywords: Breakthrough, GOR, semi-intelligent completion, throughput, productivity index. III | en_US |
dc.description.sponsorship | REPUBLIQUE ALGERIENNE DEMOCRATIQUE ET POPULAIRE Ministère de l'Enseignement Supérieur et de la Recherche Scientifique N° Série : ………/2021 Université Kasdi Merbah Ouargla Faculté des Hydrocarbures, Energies Renouvelables et Science de la Terre et de l’Univers Département de Production des Hydrocarbures MEMOIRE Pour obtenir le Diplôme de Master Option : Production Professionnel | en_US |
dc.subject | Breakthrough | en_US |
dc.subject | semi | en_US |
dc.subject | intelligent | en_US |
dc.subject | throughput | en_US |
dc.subject | completion | en_US |
dc.subject | productivity | en_US |
dc.subject | index | en_US |
dc.title | Application of Gas shut-off technic in horizontal wells using semi-intelligent completion | en_US |
dc.type | Thesis | en_US |
Appears in Collections: | Département de production des hydrocarbures- Master |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
KRIM Adel+ KOUICEM fatima zahera+ LATRECHE Nour Elhouda.pdf | 3,06 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.