Please use this identifier to cite or link to this item: https://dspace.univ-ouargla.dz/jspui/handle/123456789/41319
Title: Post and Cementing of 7" Liner with Hydraulic Liner Hanger in BKNS-3 Well
Authors: TOUMI, Nabil
Messaour, Sohaib
Yousfi Mohammed, Elmabrouk
Khenfer, Messaoud
Keywords: Liner
BKNS-3 Well
Issue Date: 2026
Abstract: This study presents the running and cementing of a 7-inch liner using a hydraulic liner hanger in well BKNS-3 located in the Berkine Basin. The work highlights the importance of casing and cementing operations in ensuring well integrity, zonal isolation, and safe hydrocarbon production. The study includes the geological and technical characteristics of the well, as well as the theoretical concepts related to liners, cementing equipment, and cement slurry properties. The practical part focuses on the liner running and cementing procedures, including the main operational calculations and field operations. The results confirm the success of the cementing operation and the effectiveness of the hydraulic liner hanger system in improving well performance and operational safety.
Description: PEOPLE'S DEMOCRATIC REPUBLIC OF ALGERIA MINISTRY OF HIGHER EDUCATION AND SCIENTIFIC RESEARCH Kasdi Merbah Ouargla University Faculty of Hydrocarbons, Renewable Energies and Earth and Universe Sciences Department of Drilling and Oilfield Mechanics Professional Master’s Thesis Field: Science and Technology Specialty: Hydrocarbons Option: Drilling
URI: https://dspace.univ-ouargla.dz/jspui/handle/123456789/41319
Appears in Collections:Département de Forage et Mécanique des chantiers pétroliers - Master

Files in This Item:
File Description SizeFormat 
Messaour Sohaib+Yousfi Mohammed Elmabrouk+Khenfer Messaoud.pdf5,58 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.