Title: Commissioning of Power Transformer
Authors: Mohamed Yakoub, KHELIFI TOUHAMI
Ibrahim, HADJI
Keywords: Power Transformer
Commissionning
Issue Date: 2022
Publisher: KASDI MERBAH UNIVERSITY_OUARGLA
Abstract: Commissioning of power transformer After new power transformer has been set up on site and before it connects with power supply and loading the load, it is must to have to go through numbers of testing procedures for confirming the specifications and performances of a power transformer. The purpose of commissioning tests on transformer is to satisfy, to pre-determined standards, that all the equipment erection is correct and that all the equipment connections or cables have been installed in accordance with the approved erection drawings and diagrams
Description: Measurement, Metrology and quality
URI: https://dspace.univ-ouargla.dz/jspui/handle/123456789/30953
Appears in Collections:Département de Génie Appliqué Licence

Files in This Item:
File Description SizeFormat 
khelifi-hadji.pdf911,92 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.